Case Studies

        SteelSurf Rotherway Roundabout Case Study

        Case Studies

        SteelSurf Rotherway Roundabout Case Study

        Application opportunity

        The A630 Rotherway roundabout is a major arterial route linking to M1 Junction 33 in South Yorkshire. 

        Recommended product

        14mm SteelSurf was recommended for this application due to its ability to perform under extreme stresses and resist deformation while providing a high skid resistance.

        Results and benefits

        SteelSurf significantly improved performance. The local authority reduced its carbon impact by 21 kg CO2e per tonne of asphalt.

        Products used:

        SteelSurf

        More from SteelPhalt™

        Case Study

        SteelSurf Wentworth Woodhouse Case Study

        Download case study

        Case Study

        SteelPave A631 Case Study

        Download case study

        Sustainable Asphalt Solutions

        We are the right choice for all your asphalt needs, now more than ever.
        Reach out to our team of experts today.

        Rotherham, UK


        Sheffield Road, The Ickles, Rotherham, 
        South Yorkshire, S60 1DR United Kingdom
        +44 (0) 1709 300500

        Cardiff, UK


        Tide Fields Road, Cardiff, Wales
        CF24 5SB United Kingdom
        +44 (0) 292240 9723

        Euskadi, Spain


        Polígono Industrial Murga s/n
        01479, Murga (Álava), Spain
        +34 945 100 230

        About

        About

        About

        About

        Get in touch